堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施

堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施

ID:36621646

大?。?03.01 KB

頁(yè)數(shù):5頁(yè)

時(shí)間:2019-05-13

堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施_第1頁(yè)
堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施_第2頁(yè)
堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施_第3頁(yè)
堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施_第4頁(yè)
堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施_第5頁(yè)
資源描述:

《堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施》由會(huì)員上傳分享,免費(fèi)在線閱讀,更多相關(guān)內(nèi)容在學(xué)術(shù)論文-天天文庫(kù)。

1、橋梁建設(shè)2014年第44卷第4期(總第227期)22BridgeConstruction,Vo1.44,No.4,2014(TotallyNo.227)文章編號(hào):1003—4722(2014)04—0022—05堆載作用下橋梁被動(dòng)樁偏移受力分析及處理措施馬遠(yuǎn)剛,王艷芬,陳晨。(1.中鐵大橋局集團(tuán)橋科院有限公司,湖北武漢430034;2.武漢理工大學(xué),湖北武漢430063)摘要:為研究堆載對(duì)橋梁被動(dòng)樁的影響,以某橋?yàn)楸尘?,采用有限差分法進(jìn)行被動(dòng)樁偏移受力分析,判斷基樁能否繼續(xù)使用并提出處理措施。采用有

2、限差分法建立下部結(jié)構(gòu)模型,計(jì)算堆載作用下橋墩偏移并與實(shí)測(cè)值對(duì)比,分析基樁內(nèi)力及偏移,按圓形截面鋼筋混凝土偏心受壓構(gòu)件計(jì)算最大裂縫寬度并評(píng)估基樁狀態(tài),根據(jù)評(píng)估結(jié)果提出處理措施。結(jié)果表明:堆栽導(dǎo)致橋墩偏移,墩頂橫向偏移計(jì)算值與實(shí)測(cè)值比較吻合;堆載作用下,基樁產(chǎn)生了較大偏移和彎矩,樁頂軸力和樁身軸力分布不均,并產(chǎn)生不同程度的負(fù)摩阻力(距堆載越近負(fù)摩阻力越大);最大裂縫寬度為0.08mm,小于規(guī)范限值,判斷基樁可以繼續(xù)使用,提出堆載反壓和應(yīng)力釋放孔聯(lián)合糾偏,開挖卸載、水平頂推結(jié)合應(yīng)力釋放孔糾偏等處理措施。關(guān)

3、鍵詞:橋梁基礎(chǔ);被動(dòng)樁;堆載;位移;軸力;負(fù)摩阻力;裂縫寬度;糾偏;有限差分法中圖分類號(hào):U443.15文獻(xiàn)標(biāo)志碼:AForceAnalysisandHandlingMeasuresforOffsettingofBridgePassivePilesUnderActionofStackedLoadMAYuan-gang,WANGYan—fen,CHENChen。(1.BridgeScienceResearchInstituteLtd.。ChinaRailwayMajorBridgeEngineerin

4、gGroup,Wuhan430034,China;2.WuhanUniversityofTechnology,Wuhan430063,China)Abstract:Tostudytheinfluencesofstackedloadonthebridgepassivepiles,abridgewastakenastheresearchobject,theforceanalysisofoffsettingofthepassivepileswasconductedbythefinitedifference

5、method,thepileswerejudgediftheycouldbecontinuouslyusedandthecor—respondinghandlingmeasureswereproposed.Themodelsforthesubstructureofthebridgeweresetupalsobythefinitedifferencemethod,theoffsettingofthepiersofthebridgeundertheac—tionofthestackedloadwasca

6、lculatedandthecalculatedvalueswerecomparedtothemeasuredones.Theinternalforcesandoffsettingofthepileswereanalyzed.Intermsofthecircularrein—forcedconcreteeccentriccompressioncomponents,themaximumcrackwidthofthepileswascal—culated,theforceconditionsofthep

7、ileswereassessedandbasedontheassessment,thehandlingmeasureswereproposed.Theresultsshowthatthestacked1oadcausestheoffsettingofthepiersandthecalculatedandmeasuredvaluesofthelateraloffsettingofthepiertopsareaccordant.Un—dertheactionofthestackedload,thegre

8、atoffsettingandbendingmomentoccurinthepiles,theaxialforcedistributioninthepiletopsandpileshaftsisnotuniformandthenegativefrictionalre—sistanceofdifferentdegreesOCCURS(theclosertothestackedload,thegreaterthenegativefric—tionalresistancew

當(dāng)前文檔最多預(yù)覽五頁(yè),下載文檔查看全文

此文檔下載收益歸作者所有

當(dāng)前文檔最多預(yù)覽五頁(yè),下載文檔查看全文
溫馨提示:
1. 部分包含數(shù)學(xué)公式或PPT動(dòng)畫的文件,查看預(yù)覽時(shí)可能會(huì)顯示錯(cuò)亂或異常,文件下載后無(wú)此問(wèn)題,請(qǐng)放心下載。
2. 本文檔由用戶上傳,版權(quán)歸屬用戶,天天文庫(kù)負(fù)責(zé)整理代發(fā)布。如果您對(duì)本文檔版權(quán)有爭(zhēng)議請(qǐng)及時(shí)聯(lián)系客服。
3. 下載前請(qǐng)仔細(xì)閱讀文檔內(nèi)容,確認(rèn)文檔內(nèi)容符合您的需求后進(jìn)行下載,若出現(xiàn)內(nèi)容與標(biāo)題不符可向本站投訴處理。
4. 下載文檔時(shí)可能由于網(wǎng)絡(luò)波動(dòng)等原因無(wú)法下載或下載錯(cuò)誤,付費(fèi)完成后未能成功下載的用戶請(qǐng)聯(lián)系客服處理。