剛性系桿拱橋更換吊桿的施工監(jiān)控

剛性系桿拱橋更換吊桿的施工監(jiān)控

ID:36715851

大小:280.05 KB

頁數(shù):5頁

時間:2019-05-14

剛性系桿拱橋更換吊桿的施工監(jiān)控_第1頁
剛性系桿拱橋更換吊桿的施工監(jiān)控_第2頁
剛性系桿拱橋更換吊桿的施工監(jiān)控_第3頁
剛性系桿拱橋更換吊桿的施工監(jiān)控_第4頁
剛性系桿拱橋更換吊桿的施工監(jiān)控_第5頁
資源描述:

《剛性系桿拱橋更換吊桿的施工監(jiān)控》由會員上傳分享,免費在線閱讀,更多相關(guān)內(nèi)容在行業(yè)資料-天天文庫。

1、橋梁建設(shè)2014年第44卷第5期(總第228期)BridgeConstruction,Vo1.44,No.5,2014(TotallyNo.228)文章編號:1003—4722(2014)05—0118~05剛性系桿拱橋更換吊桿的施工監(jiān)控張西強,趙云強,陳慧。(1.中交路橋技術(shù)有限公司,北京100018;2.北京深華達交通工程檢測有限公司,北京102200)摘要:瓊州大橋主橋為(88+98+108+98+88)m下承式鋼管混凝土系桿拱橋,該橋5跨為互相獨立的無推力外部靜定體系,拱肋均為鋼管混凝土啞鈴形斷面,共118根吊桿,下錨

2、頭部位銹蝕程度嚴(yán)重的8根吊桿采用臨時兜吊系統(tǒng)進行更換施工。為保證吊桿更換施工中結(jié)構(gòu)受力合理及安全,采用吊桿內(nèi)力和橋面標(biāo)高雙控制原則,對吊桿更換過程進行施工監(jiān)控。利用MIDASCivi1軟件建立全橋有限元模型模擬吊桿更換施工,對吊桿拉力及橋面標(biāo)高進行分析。結(jié)果表明:更換吊桿后橋面各項指標(biāo)均在控制范圍以內(nèi),且滿足橋梁設(shè)計規(guī)范要求。關(guān)鍵詞:拱橋;剛性系桿;吊桿更換;臨時兜吊系統(tǒng);橋面標(biāo)高;吊桿拉力;有限元法;施工監(jiān)控中圖分類號:U448.22;U445.7文獻標(biāo)志碼:AConstructionMonitoringandControl

3、ofHangerReplacementofaRigidTiedArchBridgeZHANGXi—qiang,ZHAOYun—qiang,CHENHui。(1.CCCCRoadandBridgeConsultantsCo.,Ltd.,Beijing100018,China;2.BeijingShenhuadaTransportEngineeringTestingCo.,Ltd..Beijing102200。China)Abstract:ThemainbridgeoftheQiongzhouBridgeisaconcrete—f

4、illedsteeltube(CFST)throughtiedarchbridgewithspanarrangement(88+98+108+98+88)m.The5-spanarchstructuresofthemainbridgearetheexternallystaticallydeterminatesystemsthataremutuallyindependentandarewithnothrust.ThecrosssectionsofthearchribsarealltheCFSTdumb—bell—shapesec

5、tionsandtherearetotally118hangersforthewholebridge.Ofthesehangers,8hangersthatwereseverelycorrodedatthepartsoftheirloweranchorheadswerereplaced,usingthetemporarybottom—carryingliftingsystem.Toensurethattheforceconditionsofthestruc—tureswerereasonableandsafeinthehang

6、erreplacementconstruction,theprincipleofdoublecontrolofthehangerinternalforcesandbridgedeckelevationwasadoptedandtheconstructionprocessofthehangerreplacementwasmonitoredandcontrolled.ThesoftwareMIDASCivilwasusedtoestablishthemodelforthewholebridge,thehangerreplaceme

7、ntconstructionwassimu—latedandthehangerinternalforcesanddeckelevationwereanalyzed.Theresultsshowthatthevariousindicesofthedeckafterthehangerreplacementarewithinthecontrolledrangesandcanmeettherelevantrequirementsofthebridgedesigncodes.Keywords:archbridge;rigidtiedme

8、mber;hangerreplacement;temporarybottom—carryingliftingsystem;deckelevation;hangertensileforce;finiteelementmethod;constructionmonito—ringa

當(dāng)前文檔最多預(yù)覽五頁,下載文檔查看全文

此文檔下載收益歸作者所有

當(dāng)前文檔最多預(yù)覽五頁,下載文檔查看全文
溫馨提示:
1. 部分包含數(shù)學(xué)公式或PPT動畫的文件,查看預(yù)覽時可能會顯示錯亂或異常,文件下載后無此問題,請放心下載。
2. 本文檔由用戶上傳,版權(quán)歸屬用戶,天天文庫負(fù)責(zé)整理代發(fā)布。如果您對本文檔版權(quán)有爭議請及時聯(lián)系客服。
3. 下載前請仔細(xì)閱讀文檔內(nèi)容,確認(rèn)文檔內(nèi)容符合您的需求后進行下載,若出現(xiàn)內(nèi)容與標(biāo)題不符可向本站投訴處理。
4. 下載文檔時可能由于網(wǎng)絡(luò)波動等原因無法下載或下載錯誤,付費完成后未能成功下載的用戶請聯(lián)系客服處理。