《某水庫除險加固初步設(shè)計》由會員上傳分享,免費在線閱讀,更多相關(guān)內(nèi)容在行業(yè)資料-天天文庫。
1、設(shè)計總說明PS水庫位于河北省沙河市境內(nèi),屬海河流域滏陽河系沙洺河支流。本工程存在的主要問題如下:(1)大壩基礎(chǔ)抗滑不滿足要求,壩體高水位時滲漏嚴(yán)重。(2)壩頂高程在不滿足規(guī)范要求。(3)放水洞閘閥損壞。(4)大壩下游無消能防沖設(shè)施。經(jīng)鑒定大壩屬于三類壩。PS水庫除險加固設(shè)計是根據(jù)實際工程進行初步設(shè)計,主要內(nèi)容包括壩體的抗滑穩(wěn)定計算,壩基應(yīng)力復(fù)合,溢流壩過流能力及消能計算等幾個部分。壩體抗滑穩(wěn)定計算是重力壩設(shè)計的一項重要內(nèi)容,其目的是驗算壩體沿壩基面的抗滑穩(wěn)定安全度,利用公式判別大壩是否滿足抗滑穩(wěn)定要求。經(jīng)計
2、算得大壩在某些工況下不滿足抗滑穩(wěn)定要求。應(yīng)力分析的目的是檢驗壩體在施工和運用期間是否滿足強度要求,利用材料力學(xué)的方法檢驗應(yīng)力是否滿足要求。經(jīng)計算得大壩在某些工況下不滿足要求。溢流壩過流能力驗算及消能計算依據(jù)《溢洪道設(shè)計規(guī)范》SL253-2000計算。經(jīng)計算得滿足要求。最后進行除險加固方案設(shè)計,使不滿足要求的工況滿足設(shè)計要求,使大壩得到加固。關(guān)鍵詞:抗滑穩(wěn)定、應(yīng)力復(fù)合、過流能力及消能計算。GeneraldescriptionofdesignPSreservoirinHebeiprovinceShahecity
3、withintheboundaries,theHaiheRiverValleyofMingheRivertributaryofFuyangRiversand.Theengineeringproblemsasfollows(1)Thedamfoundationagainstslidingofdamdoesnotmeettherequirements,theseriousleakageofhighwaterlevel.(2)Thecrestelevationdoesnotmeettherequirementso
4、fthecodeinthestandard.(3)Thedischargevalvedamage.(4)Thedamdownstreamenergydissipationfacilities.Theidentificationofthedambelongstothethreekindofdam.PSreservoirreinforcementdesignisaccordingtotheactualprojectpreliminarydesign,themaincontentsincludethecalcul
5、ationofstabilityagainstslidingofdam,damfoundationstresscomposite,spillwaydischargecapacityandenergydissipationandotherparts.Calculationonstabilityagainstslidingofgravitydamisanimportantissueinthedesign,itspurposeistocheckdamalongtheinterfacebetweendamandfo
6、undationstabilityagainstslidingofdamsafety,usingtheformulaforjudgingwhethermeettherequirementsofstabilityagainstsliding.Thecalculationofdaminsomecasesdonotmeettherequirementsofstabilityagainstsliding.Stressanalysistotestthedaminconstructionandusingperiodwh
7、ethermeetthestrengthrequirements,useofmaterialmechanicsmethodtestingstresswhethermeettherequirements.Thecalculationofdaminsomecasesdonotmeettherequirements.Spillwayflowcapacitycalculationandenergydissipationcalculationbasedon"designcodeforSpillway"SL253-20
8、00calculation.Throughcalculation,tomeettherequirements.Thefinalprojectreinforcementdesign,whichdoesnotmeettherequirementsofoperationandmeetthedesignrequirements,thedamisstrengthened.Keywords:anti-slidingstabi