《某水庫除險(xiǎn)加固初步設(shè)計(jì)》由會(huì)員上傳分享,免費(fèi)在線閱讀,更多相關(guān)內(nèi)容在行業(yè)資料-天天文庫。
1、河北工程大學(xué)畢業(yè)設(shè)計(jì)(論文)設(shè)計(jì)總說明PS水庫位于河北省沙河市境內(nèi),屬海河流域滏陽河系沙洺河支流。本工程存在的主要問題如下:(1)大壩基礎(chǔ)抗滑不滿足要求,壩體高水位時(shí)滲漏嚴(yán)重。(2)壩頂高程在不滿足規(guī)范要求。(3)放水洞閘閥損壞。(4)大壩下游無消能防沖設(shè)施。經(jīng)鑒定大壩屬于三類壩。PS水庫除險(xiǎn)加固設(shè)計(jì)是根據(jù)實(shí)際工程進(jìn)行初步設(shè)計(jì),主要內(nèi)容包括壩體的抗滑穩(wěn)定計(jì)算,壩基應(yīng)力復(fù)合,溢流壩過流能力及消能計(jì)算等幾個(gè)部分。壩體抗滑穩(wěn)定計(jì)算是重力壩設(shè)計(jì)的一項(xiàng)重要內(nèi)容,其目的是驗(yàn)算壩體沿壩基面的抗滑穩(wěn)定安全度,利用公式判別大壩是否滿足抗滑穩(wěn)定要求。經(jīng)計(jì)算得大壩
2、在某些工況下不滿足抗滑穩(wěn)定要求。應(yīng)力分析的目的是檢驗(yàn)壩體在施工和運(yùn)用期間是否滿足強(qiáng)度要求,利用材料力學(xué)的方法檢驗(yàn)應(yīng)力是否滿足要求。經(jīng)計(jì)算得大壩在某些工況下不滿足要求。溢流壩過流能力驗(yàn)算及消能計(jì)算依據(jù)《溢洪道設(shè)計(jì)規(guī)范》SL253-2000計(jì)算。經(jīng)計(jì)算得滿足要求。最后進(jìn)行除險(xiǎn)加固方案設(shè)計(jì),使不滿足要求的工況滿足設(shè)計(jì)要求,使大壩得到加固。關(guān)鍵詞:抗滑穩(wěn)定、應(yīng)力復(fù)合、過流能力及消能計(jì)算。2河北工程大學(xué)畢業(yè)設(shè)計(jì)(論文)GeneraldescriptionofdesignPSreservoirinHebeiprovinceShahecitywithint
3、heboundaries,theHaiheRiverValleyofMingheRivertributaryofFuyangRiversand.Theengineeringproblemsasfollows(1)Thedamfoundationagainstslidingofdamdoesnotmeettherequirements,theseriousleakageofhighwaterlevel.(2)Thecrestelevationdoesnotmeettherequirementsofthecodeinthestandard.(3)
4、Thedischargevalvedamage.(4)Thedamdownstreamenergydissipationfacilities.Theidentificationofthedambelongstothethreekindofdam.PSreservoirreinforcementdesignisaccordingtotheactualprojectpreliminarydesign,themaincontentsincludethecalculationofstabilityagainstslidingofdam,damfoun
5、dationstresscomposite,spillwaydischargecapacityandenergydissipationandotherparts.Calculationonstabilityagainstslidingofgravitydamisanimportantissueinthedesign,itspurposeistocheckdamalongtheinterfacebetweendamandfoundationstabilityagainstslidingofdamsafety,usingtheformulafor
6、judgingwhethermeettherequirementsofstabilityagainstsliding.Thecalculationofdaminsomecasesdonotmeettherequirementsofstabilityagainstsliding.Stressanalysistotestthedaminconstructionandusingperiodwhethermeetthestrengthrequirements,useofmaterialmechanicsmethodtestingstresswheth
7、ermeettherequirements.Thecalculationofdaminsomecasesdonotmeettherequirements.Spillwayflowcapacitycalculationandenergydissipationcalculationbasedon"designcodeforSpillway"SL253-2000calculation.Throughcalculation,tomeettherequirements.Thefinalprojectreinforcementdesign,whichdo
8、esnotmeettherequirementsofoperationandmeetthedesignrequirements,thedamisstrengthen