《橋梁設(shè)計(jì)計(jì)算書》word版

《橋梁設(shè)計(jì)計(jì)算書》word版

ID:29045398

大?。?.71 MB

頁(yè)數(shù):94頁(yè)

時(shí)間:2018-12-16

《橋梁設(shè)計(jì)計(jì)算書》word版_第1頁(yè)
《橋梁設(shè)計(jì)計(jì)算書》word版_第2頁(yè)
《橋梁設(shè)計(jì)計(jì)算書》word版_第3頁(yè)
《橋梁設(shè)計(jì)計(jì)算書》word版_第4頁(yè)
《橋梁設(shè)計(jì)計(jì)算書》word版_第5頁(yè)
資源描述:

《《橋梁設(shè)計(jì)計(jì)算書》word版》由會(huì)員上傳分享,免費(fèi)在線閱讀,更多相關(guān)內(nèi)容在應(yīng)用文檔-天天文庫(kù)

1、湖南科技大學(xué)瀟湘學(xué)院本科生畢業(yè)設(shè)計(jì)(論文)摘要本設(shè)計(jì)為九江大橋引橋上部結(jié)構(gòu)設(shè)計(jì)。該橋全長(zhǎng)150m,設(shè)計(jì)的跨徑為25m,截面為單箱單室的等截面形式。整個(gè)設(shè)計(jì)可以分成兩個(gè)部分:第一部分,結(jié)構(gòu)建摸和內(nèi)力計(jì)算。選擇橋的橋型及孔徑劃分、主梁截面形式與主梁高度的擬定、截面細(xì)部尺寸擬定,隨后進(jìn)行結(jié)構(gòu)內(nèi)力計(jì)算。在完成了恒載內(nèi)力的計(jì)算后,又進(jìn)行了活載內(nèi)力計(jì)算、次內(nèi)力計(jì)算、內(nèi)力組合計(jì)算,并畫出內(nèi)力包絡(luò)圖。第二部分,預(yù)應(yīng)力鋼束估算及布置,預(yù)應(yīng)力損失及有效預(yù)應(yīng)力計(jì)算,鋼束布置后的內(nèi)力計(jì)算及組合,強(qiáng)度計(jì)算與驗(yàn)算,應(yīng)力、應(yīng)變及其它驗(yàn)算。關(guān)鍵詞:混凝土簡(jiǎn)支轉(zhuǎn)連續(xù)梁橋;單元?jiǎng)澐趾徒⒛P停粌?nèi)力計(jì)算;強(qiáng)度應(yīng)力應(yīng)變驗(yàn)算dslop

2、etofacilitateemptying.(1)duringtheexcavationprocess,feelfreetocheckthestatusofsideslope,verticaldigdepthisgreaterthan1.5M,accordingtothechangesofsoil,excavation(Groove)ortrenchsupportpreparation,topreventcollapse.(2)excavation(Groove)andwhenthetrenchshouldnotdigtothedesignheightofthefollowing,ifnote

3、xactlydiggingbaseelevationistodesign,persistenceofelevationabovealayerofsoilisnotdug,tocopyafterpingdugoutbyhand.(3)mechanicalconstructiondigintotheEarth,diggingmanualatanytime,andtrolleystotransportEarthmachinerytodigtheplace,soastousethemachineryofcherry-picking.5,trimming...(1)soilexcavationonara

4、inyday,theirworkshouldnotbetoolarge,shouldbedonepiecemeal,bystaging.(2)therainatthetimeofconstructionintheexcavationandearth-movingrequiredgreatattentiontoslopestability.Ifnecessary,theappropriateslowslope,orbraces,whileinthepits(Groove)outsidesurroundedbyEarthenbermsordiggingditches,preventsurfacew

5、aterfromentering.Alwayscheckontheslope,support,anembankment,identifyproblemsanddealwith.II,backfillEngineering(a)constructionpreparationresearchfieldsiteformation,earthfillconstructionplan,determinethefillline,order,range,slope,drainagelevels,andsoon.1,theengineeringaccordingtothecharacteristicsofsp

6、ecies,densityofthefillquantityrequirements,constructionsiteconditionsofreasonablefillsoilmoisturecontrol,virtualshopandcompactionparameters,suchasnumber.2,undergroundandabove-groundpipelinesshouldbefoundoutbeforeconstructionobstacles,requirementsshallinaccordancewiththeconstructionplan,theconstructi

7、onofabovegroundandundergroundobstacleclearanceintheregionanddealt湖南科技大學(xué)瀟湘學(xué)院本科生畢業(yè)設(shè)計(jì)(論文)dslopetofacilitateemptying.(1)duringtheexcavationprocess,feelfreetocheckthestatusofsideslope,verticaldigdepthisgre

當(dāng)前文檔最多預(yù)覽五頁(yè),下載文檔查看全文

此文檔下載收益歸作者所有

當(dāng)前文檔最多預(yù)覽五頁(yè),下載文檔查看全文
溫馨提示:
1. 部分包含數(shù)學(xué)公式或PPT動(dòng)畫的文件,查看預(yù)覽時(shí)可能會(huì)顯示錯(cuò)亂或異常,文件下載后無此問題,請(qǐng)放心下載。
2. 本文檔由用戶上傳,版權(quán)歸屬用戶,天天文庫(kù)負(fù)責(zé)整理代發(fā)布。如果您對(duì)本文檔版權(quán)有爭(zhēng)議請(qǐng)及時(shí)聯(lián)系客服。
3. 下載前請(qǐng)仔細(xì)閱讀文檔內(nèi)容,確認(rèn)文檔內(nèi)容符合您的需求后進(jìn)行下載,若出現(xiàn)內(nèi)容與標(biāo)題不符可向本站投訴處理。
4. 下載文檔時(shí)可能由于網(wǎng)絡(luò)波動(dòng)等原因無法下載或下載錯(cuò)誤,付費(fèi)完成后未能成功下載的用戶請(qǐng)聯(lián)系客服處理。