《斜交連續(xù)箱梁頂推施工中落梁仿真分析》由會(huì)員上傳分享,免費(fèi)在線閱讀,更多相關(guān)內(nèi)容在學(xué)術(shù)論文-天天文庫(kù)。
1、橋梁建設(shè)2014年第44卷第1期(總第224期)BridgeConstruction。Vo1.44,No.1,2014(TotallyNo.224)101文章編號(hào):1003—4722(2014)01—0101—06斜交連續(xù)箱梁頂推施工中落梁仿真分析蔣田勇,安磊,田仲初,徐金華(長(zhǎng)沙理工大學(xué)土木與建筑學(xué)院,湖南長(zhǎng)沙410114)摘要:為了解斜交連續(xù)梁橋頂推落梁施工中結(jié)構(gòu)受力狀態(tài),給施工提供技術(shù)支撐,以長(zhǎng)沙市營(yíng)盤東路瀏陽(yáng)河大橋?yàn)槔?,采用在支承處?jié)點(diǎn)施加強(qiáng)迫豎向位移的方法模擬箱梁的落梁過(guò)程,對(duì)落梁過(guò)程進(jìn)行仿真分析,計(jì)算千斤頂?shù)捻斏突炷料淞旱膽?yīng)力,與實(shí)測(cè)結(jié)果進(jìn)行比較,并分析相
2、鄰墩頂?shù)牧旱赘卟顚?duì)頂升力和箱梁應(yīng)力的影響。結(jié)果表明:箱梁頇、底板始終處于受壓狀態(tài),且只有頇升處的梁體及其相鄰粱體的應(yīng)力變化相對(duì)較大;當(dāng)相鄰墩頂?shù)牧旱赘卟钤?5mm以內(nèi)時(shí),其頂升墩處的項(xiàng)升力增量在5以內(nèi),且頂升墩處箱梁截面仍處于受壓狀態(tài);落梁過(guò)程中,頂升力和箱梁應(yīng)力的仿真計(jì)算結(jié)果與實(shí)測(cè)結(jié)果吻合較好,說(shuō)明仿真分析準(zhǔn)確、可靠。關(guān)鍵詞:連續(xù)梁橋;斜交橋;箱形梁;頂推法施工;仿真分析;落梁;梁底高差;應(yīng)力;有限元法中圖分類號(hào):U448.21;U445.462文獻(xiàn)標(biāo)志碼:ASimulationAnalysisofJacking—downofGirderinIncrementalLaun
3、chingConstructionofObliqueContinuousBoxGirderJIANGTian—yong,ANLei,TIANZhong。chu,XUJin—hua(SchoolofCivilEngineeringandArchitecture,ChangshaUniversityofScienceandTechnology,Changsha410114,China)Abstract:Tohaveanunderstandingofthestructuralforceconditionsoftheobliqueconcretecontinuousboxgirde
4、rbridgeintheconstructionofincrementallaunchingandjacking—downofthegirderandtoprovidetechnicalsupportfortheconstruction,theYingpanEastRoadLiuyangRiv—erBridgeinChangshacitywascitedasanexample,theprocessofjacking—downoftheconcreteboxgirderofthebridgewassimulatedandanalyzedbythemethodofapplyin
5、gforcedverticaldis—placementatthesupportnodalpoint,thejackingforcesofthejacksandthestressofthegirderwerecalculated,thecalculationswerecomparedtothemeasurementsandtheinfluencesofthegirderbottomheightdifferencesoftheadjacentpiertopsonthejackingforcesandthestresswereanalyzed.Theresultsofthesi
6、mulationandanalysisrevealthatthetopandbottomslabsoftheboxgirderhavebeenincompressionallthetimewiththeexceptionthatonlythestressofthegirderatthejackingpierandadjacentpierschangesrelativelygreatly.Whentheheightdiffer—encesofthegirderbottomattheadjacentpiertopsarewithin25mm,theincrementofthej
7、ack—ingforcesofthejackingpierarewithin5andthecrosssectionofthegirderatthejackingpierremainscompressive.Inthejacking—downofthegirder,thesimulationcalculationsofthejackingforcesandthestressofthegirderarewellagreeablewiththemeasurements,showingthatthesimulationan